Work tasks on this project generally include traffic control, erosion and sediment control, trench sheeting, shoring, and bracing, temporary water service connections, partial removal of existing 2” water main, installation of new 6” water main, installation of one valve assembly, removal of one 2” valve, and surface restoration. All other items or details not mentioned above that are required by the Plans or the Contract Documents shall be furnished, fabricated, constructed, or installed. The Engineer’s Estimate for this work is $78,315.
|
|
8/29/2022 12:00 AM
|
|
9/29/2022 2:00 PM
|
|
Yes - See Miscellaneous Info.
|
|
Will Bond, PE, City Engineer 530.275.7436 wbond@cityofshastalake.org
|
|
Yes
|
|
None
|
|
The City of Shasta Lake provides Contract Documents for projects electronically and free of charge via the internet at www.ciplist.com. This site is the only approved location for prospective bidders to obtain official City Contract Documents. NO HARD COPY CONTRACT DOCUMENTS WILL BE AVAILABLE FOR PURCHASE. It is the responsibility of each prospective bidder to verify the completeness of their printed Contract Documents prior to submitting a bid and accompanying executed addenda acknowledgment forms. The City of Shasta Lake does not assume any liability or responsibility for defective or incomplete copying, excerpting, scanning, faxing, downloading or printing of the Contract Documents. Be advised that the information contained on ciplist.com may change without notice to prospective bidders. It is the responsibility of each prospective bidder to check ciplist.com on a daily basis through the date and time of bid opening for any applicable addenda or updates.
|
|
7 am to 4 pm, M-F
|
|
All Contractors and Subcontractors shall possess appropriate Contractor’s Licenses for their trade at the time the contract is awarded.
|
|
All Contractors bidding on or performing work within the City of Shasta Lake involving connections to, or modifications of, the City’s potable water distribution system shall carry a Water Distribution Operator, Grade 2 certification, and shall be required to maintain active certification throughout the entire duration of the project. All work on new or existing potable systems shall be performed under the DIRECT SUPERVISION of the certified Operator employed by the Contractor. Additional information is available on the City’s website: http://cityofshastalake.org/bids.aspx?bidID=44
|
|
A prebid conference is scheduled between staff and interested bidders at Shasta Lake City Hall, 4477 Main Street, Shasta Lake, on Wednesday, September 14, 2022 at 9 a.m., at which time the project will be reviewed. All interested bidders are encouraged to attend.
|
|
|
|